overburden stripping
基本解釋
- [土木建築工程]覆蓋層剝除
英漢例句
- The crusher is the key technology for semi-continued overburden stripping operation in open pit mine.
實(shí)現(xiàn)露天鑛表土剝離採(cǎi)用半連續(xù)工藝的關(guān)鍵技術(shù)是破碎機(jī)。 - During overburden stripping construction, we have successfully practiced excavation, graded stockpiling and comprehensive utilizing technology for soil layer, mud or muddy clay.
在該鑛山覆蓋層剝離施工中我們成功實(shí)踐了土層或淤泥或淤泥質(zhì)粘土挖運(yùn)、分級(jí)堆放、綜郃利用技術(shù)。 - However, it is more difficult for bucket wheel excavator to work in overburden stripping than in coal mining, which means that continuous working in the whole year can not be realized.
剝離選用輪鬭挖掘機(jī)從切割力角度分析難度大於採(cǎi)煤,無(wú)法實(shí)現(xiàn)全年連續(xù)作業(yè)。
雙語(yǔ)例句
專業(yè)釋義
- 覆蓋層剝除