batch job scheduling
常見例句
- The objective of this paper is to minimize the delivery time and the batch scheduling problems with job processing times are the same.
本文主要研究極小化工件配送時(shí)間及工件加工時(shí)間相同時(shí)的分批配送問題。 - Again, when scheduling non-sequential batch jobs, they can all be scheduled at 23:00 because they will be queued one at a time though the job spooler.
同樣,在調(diào)度不連續(xù)的批作業(yè)時(shí),可以把它們都安排在 23:00,因爲(wèi)它們會通過假脫機(jī)程序每次運(yùn)行一個(gè)。 - In batch scheduling problems, B jobs can be processed on the machine at most, and they are not allowed to be interrupted, removed, or added a new job during processing.
在分批排序問題中,機(jī)器一次最多可加工B個(gè)工件,工件在加工過程中不允許被打斷、移出或加入新工件; 返回 batch job scheduling