wharf due
常見(jiàn)例句
- The Walkie-Talkie building, work on which started in January and is due to be completed in 2014, is a joint venture with Canary Wharf Group.
一月開(kāi)工、定于2014年完工的“步話機(jī)”大廈就是與金絲雀碼頭集團(tuán)(Canary Wharf Group)的合作項(xiàng)目。 - Through analysis on the types and characteristics of damage of high-piled wharf due to earthquake, a more reasonable link-banked structure of high-piled wharf is proposed.
通過(guò)對(duì)過(guò)去高樁碼頭發(fā)生震害的類型及特點(diǎn)的分析,結(jié)合接岸結(jié)構(gòu)連接處理中的常見(jiàn)病害及其對(duì)碼頭的不利影響,提出一種比較合理的高樁碼頭接岸結(jié)構(gòu)處理連接形式。 - The Walkie-Talkie building, work on which started in January and is due to be completed in 2014, is a joint venture with Canary Wharf Group.
ECONOMIST: Prime numbers 返回 wharf due