soil-water recharge
常見例句
- Three preventive measures just as cement-soil mixed piles, heap loading and recharge water are provided in the paper in order to reduce the impact of vacuum preloading on surrounding buildings.
提出了采用打設(shè)水泥攪拌樁、堆載和回灌水三種防護(hù)措施結(jié)合來降低真空預(yù)壓對(duì)周邊建筑物環(huán)境的影響。 返回 soil-water recharge