girder beam structure
基本解釋
- [能源科學(xué)技術(shù)]游粱結(jié)構(gòu)
英漢例句
- The 600 tons gantry girder for the two-beam structure is divided into 20 pre-workshop to the final assembly site in place.
本課題研究的600噸龍門吊主梁為雙梁結(jié)構(gòu),共分20段進行車間預(yù)制,最后現(xiàn)場就位拼裝。 - Finally, probably determine the main-beam size of the main girder and end girder in the structure of the metal structure, and it's structure analysis.
最后大概確定了橋架結(jié)構(gòu)中主梁和端梁的主要尺寸,并對其進行了有限元分析。 - The curved beam finite element method, which is based on the theory of curved girder structure analysis, has been adopted for analyzing the curved bridge structure in this Paper.
本文根據(jù)曲線梁橋的結(jié)構(gòu)分析理論,采用曲桿有限元法對曲線梁橋進行結(jié)構(gòu)分析。
雙語例句
專業(yè)釋義
- 游粱結(jié)構(gòu)