detailed construction schedule
基本解釋
- [土木建筑工程]施工進度計劃
英漢例句
- Based on the researches above, the detailed engineering measure and non-engineering measure for risk handling is designed to control construction-schedule risk of DS WKP effectively.
在上述研究基礎上,制定了具體的風險應對工程措施和非工程措施,有效控制了DS水閘樞紐工程進度風險。
雙語例句
專業(yè)釋義
- 施工進度計劃