broad crested weir
基本解釋
- 寬頂堰
英漢例句
- The text introduces the calculation of overfalling quantity should be based on broad crested weir or short canal when renovating overtopping flooding.
提出整治工程漫頂溢流時(shí)溢流量按寬頂堰或短渠計(jì)算; - The method was adapt broad crested weir theory derivation to calculation flood rate of discharge and conjecture design rate of discharge through field investigate information of bridge.
該計(jì)算方法是通過實(shí)地調(diào)查橋前水深等資料,采用嚴(yán)密的寬頂堰理論推導(dǎo),求得洪水流量,進(jìn)而推求設(shè)計(jì)流量。 - The results of flood carrying capacity curve and discharge coefficient for camel hump weir and broad crested weir have been obtained by sectional hydraulic model test of Miaozitou sluice.
通過廟子頭水電站兩種堰型選擇水閘斷面模型試驗(yàn)研究,獲得了寬頂堰與駝峰堰的泄流能力曲線和綜合流量系數(shù)等試驗(yàn)成果。
雙語例句
詞組短語
- broad -crested measuring weir 寬頂量水堰
- broad d crested weir 寬頂堰
- broad crested weir scheme 寬頂堰方案
- broad crested weir theory 寬頂堰理論檢驗(yàn)法
- broad crested weir flow 寬頂堰流
短語
專業(yè)釋義
- 寬頂堰
- 寬頂堰