boring tower
常見例句
- The boring tower is arranged on the unilateral cantilever survey platform.
鉆塔,設(shè)于單側(cè)懸臂勘探平臺 上;
ip.com - Owing to the change of operating condition and serious water bearing in crude oil, the top of atmospheric tower is corroded and boring.
因操作條件變化和原油帶水嚴重,造成常壓塔頂部塔壁腐蝕穿孔。 - The equipment, comprising the boring tower inside the working area cantilever side and the slurry pumps on the boat body, is arranged on the survey platform.
設(shè)備,設(shè)于勘探平臺上,包括位于工作區(qū)懸臂側(cè)內(nèi)的鉆機和位于船體上的泥漿泵。
ip.com 返回 boring tower