NATM
基本解釋
- 新奧法
英漢例句
- At last, The paper analyzes the calculation of the shallow cover load part, and states the mechanic concept of rock dynamic properties of the NATM.
最后分析了淺埋段荷載的計(jì)算,闡述了新奧法的巖體動(dòng)態(tài)性質(zhì)的力學(xué)概念。 - In this paper we dissertate the FEM numerical simulation and the monitoring technology home and abroad in highway tunnel construction, then summarize the NATM in detail.
本文首先系統(tǒng)論述了國(guó)內(nèi)外有限元數(shù)值模擬及監(jiān)控量測(cè)技術(shù)在公路隧道建設(shè)中的應(yīng)用,并對(duì)目前廣泛采用的新奧法加以詳細(xì)概述。 - Based on basic principles of NATM,a finite element numerical emulation analysis and optimized design on supporting in section through F3 Fault of Zipingpu sluiceway No.
本文基于新奧法的基本原理,對(duì)紫坪鋪水利工程1%23泄洪洞穿越F3斷層段的支護(hù)設(shè)計(jì)方案進(jìn)行了有限元數(shù)值仿真分析和優(yōu)化設(shè)計(jì)。 - Especially New Austrian Tunneling Method(NATM) construction has sometimes been adopted in highway tunnel project, which has been applied only 20 years in our country, and people are probing into and practicing it.
特別是高速公路隧道工程往往采用新奧法施工,其應(yīng)用在我國(guó)僅僅二十來(lái)年的時(shí)間,人們對(duì)新奧法的認(rèn)識(shí),處于探索與實(shí)踐中。 - When constructing a highway tunnel with the New Austrian Tunneling Method (NATM), monitoring is essential to ensure safety, to optimize design and to gain the fundamental data for structure analysis.
公路隧道施工監(jiān)控量測(cè)是新奧法施工的重要內(nèi)容,對(duì)保障施工安全、優(yōu)化設(shè)計(jì)、為隧道結(jié)構(gòu)分析提供實(shí)測(cè)數(shù)據(jù)有重要作用。